HeavyMap frontend handoff (2026-10-18)

Objective: prepare the synthetic prototype in PR #71 for Morgen’s review, while Industrial Atlas validates Hamilton independently. Tools may be Codex, Claude Code or Cursor according to the assigned task. Existing references: NA-32 epic; NA-305 browser notice; NA-308 run records; NA-309 addresses without parcels; NA-310 experience profiles. Linked Linear issues own task status.

Read first and task reference

This documentation PR is based on PR #81 at 6ff9756, branch hm-front/handoff-2026-10-18. Until these changes reach main, use the documentation PR’s head ref for instructions and the assigned implementation branch for code. A checkout of main alone may lack both these instructions and web/. Refresh PR heads, base revisions and conflicts at pickup.

Boundaries

Agents never merge. Before merging, verify whether the changed paths trigger publication and whether jurisdiction approval applies. The earlier review’s Pages/Railway observations are historical evidence, not a current verification for every change. No public publish/deploy without Morgen’s jurisdiction gate sign-off; building/testing deploy tooling is allowed.

PR #80 records the merged split plan; split execution and identifier migration require a separate assignment from Morgen. Preparing or merging #71 does not resume the split, move files or authorize wire/package renaming. Keep heavymap_id and current schema names until a separately accepted contract migration.

Work against invented synthetic contract fixtures. Real-data integration uses a pinned screened Atlas artifact when eligible. Do not change the Atlas pipeline, scripts or dataset truth under a frontend assignment. The explicitly assigned #71 conflict repair may preserve/append existing documentation and sheet rows as its review describes. Do not commit production tiles/shards, dist/, local-data/ or identifying values. Existing approved small synthetic test fixtures are distinct from production outputs. Do not access heavymap-restricted.

First bounded task: prepare #71

Assign one implementation owner on codex/heavymap-v0-frontend. The branch name does not require Codex to remain its owner; record any transfer before another agent writes it.

Done means the bounded repairs are reviewable, conflicts addressed, npm tests/build and applicable Playwright checks run against that branch, and skipped/unrun checks explained. Return PR/head SHA, B/S checklist, test evidence and synthetic screenshots where useful. No merge. A full adapter, all gap/sliver states and responsive enhancements are follow-on tasks, not implicit #71 repairs.

Independent follow-on tasks

Use NA-318 for the schema-v1 adapter, NA-319 for gap/sliver fixtures and NA-320 for desktop/mobile interaction/accessibility. Their acceptance stays separate from NA-312. NA-316 owns the pinned-artifact integration.

A separate owner may draft HM-15 CI, HM-04 screening design or HM-13 build-only deployment design. No overlapping edits to the prototype owner’s worktree.

CI validation must name a branch containing web/. Either wait for #71 to land, or explicitly stack on its current head and record that dependency; do not claim a successful web check against main without the files. Record any later Firefox coverage as a separate acceptance result.

HM-03 adapter, HM-05 gaps, HM-07 slivers and HM-08 browser notice may use explicitly based follow-on branches and agreed fixtures. Real-data integration waits for an eligible artifact, not for the entire Atlas backlog. HM-02 depends on D1; HM-06 on D3/D4; HM-11/HM-12 on D2.

Decisions and evidence

D1 (Pages strategy), D2 (startup budget meaning), D3 (held-info presentation), D4 (withheld_disclosure) and D6 (Railway) remain open unless separately recorded as decided. D7 is complete: Morgen authorized the Linear project updates and both descriptions, resources, outcome milestones and dated updates were applied. This supersedes #81’s STOP on editing the project description for that authorized work. D4’s manifest_entry is interim. No settings/Linear changes are authorized by a recommendation in the backlog.

D5 has one destination: heavymap-planning/frontend/19-process-insights.csv with HM-PI IDs. The earlier alternate paths are superseded. Until that file exists, put reusable frontend findings in the PR’s Process insights section using the shared columns; never put HM-PI rows in Atlas sheet 19. Existing pending HM-PI-0001 through 0008 remain in backlog section 4; reverify historical observations before using them as current evidence.

Recorded state, 2026-10-18: PR #81 head 6ff9756, PR #71 head 1d74db5 (draft, conflicting), PR #80 merged as plan-only at 6333e55; migration execution remains separately assigned. These are snapshots, not permanent instructions. The old review reports npm checks/build passed but Playwright unrun; this documentation change makes no new runtime claim.

Interface asks and next action

BE-1 through BE-16 are drafted asks, not delivered capabilities. Use current dossier schema v1, suffix-based shards and 0-1 share fractions. The register in backlog section 3 holds interface details and exact blocking scope; task status belongs to linked Linear issues. Each shared change has one preparing owner and a named Atlas reviewer.

Next action: use NA-312 under frontend epic NA-32 for the bounded #71 repair packet, refresh branch state and collect review evidence. Already-authorized Atlas operational validation proceeds concurrently. Follow-on tasks and first artifact integration receive their own acceptance claims.